Title: Sky Harbour Hangar Development at OPF
Project Timeline:
- Phase 1 Completed Winter 2024
- Phase 2 Scheduled Completion: Fall 2026
Project Summary:
- Phase 1: Construction of three buildings, each with four individual hangars, totaling 160,000 square feet of hangar space, as well as the apron and taxiway servicing the project.
- Phase 2: Construction of three hangar buildings, totaling approximately 109,968 square feet, and a general services shop with 2,634 square feet.
Project Benefits:
The new hangars will provide job opportunities and stimulate the local economy while increasing the interest and visibility of Miami-Opa Locka Executive Airport (OPF).

Project Title: Bombardier Service Center at Miami-Opa locka Executive Airport (OPF)
Project Timeline:
Project Summary:
- Construction of a new facility for Bombardier aircraft maintenance and repairs at Miami-Opa locka Executive Airport (OPF).
Project Benefits:
- Increase aircraft maintenance services, provide job opportunities to our community and stimulate the local economy.

Project Title: Embassair FBO at OPF
Project Timeline:
Project Summary:
- Construction of a new fixed-base operator (FBO) for Embassair at Miami-Opa locka Executive Airport (OPF)
Project Benefits:
- A new service option for private, luxury travel in South Florida.
- In addition to FBO service, Embassair will include covered aircraft parking, anti-collision and anti-burglary systems.
- The facility will provide job opportunities to our community as well as stimulate the local economy.
- For more details, visit Embassair.

Project Title: TMB Runway Incursion Mitigation
Project Timeline:
Project Summary:
- The project is to reconfigure the taxiways and runways on the southside of Miami Executive Airport (TMB).
- The scope of work includes the modification of Runway 31, shortening Runway 31 by approx. 200 feet, modification to the intersection between Runway 31 and Taxiways E and H, relocation of the E3 connector, 300 feet to the East, a new perpendicular connector for the relocated Runway 31 threshold, the extension of D2 connector to intersect Taxiway E and H and the extension of Taxiway H to the Runway 9R threshold.
Project Benefits:
- Improve Aircraft traffic
- Mitigate current flight pattern conflicts between Runway 9R-27L and Runway 13-31
- The project is required to comply with the Federal Aviation Administration (FAA) mandate of reducing runway incursions through the Runway Incursion Mitigation (RIM) Program. The FAA is discouraging entrances that provide direct access to runways to reduce the risk of collision. This hot spot, HS 1, was identified by the FAA in July 2015 for mitigation.This project will improve the existing taxiway condition to conform to modern FAA design standards which mandate taxiway geometry to reduce the probability of runway incursions.

Project Title: Miami Homestead General Aviation Security Enhancement
Project Timeline:
- Scheduled Completion: Summer 2025
Project Summary:
- The project consists of constructing a new AOA Fence, new access control, and security cameras.
Project Benefits:
- Meet the Federal Aviation Administration (FAA) and Transportation Security Administration (TSA) security standards.
